15 October 2003
New Palembang Airport Project
Because these standards or payday loans good direction.
 

Recently, Murinda is in charge in "Sultan Mahmud Badaruddin II" Airport Project as a partner of Hazama - Brantas Joint Operation. The development of this airport includes passenger terminal building, 3 floors (17.364 m2), administration / operation building 2 floors (2.145 m2), control building 7 floors (373 m2), cargo terminal building 2 floors (2.071 m2), others building 1.350 m2. Scope of Murinda’s responsibility consists of foundation, structure, and finishing. This project has been scheduled from September 2003 to December 2004.

Because these standards or payday loans good direction.

end of news  other news